Project requirements

The client needs to carry out repair, restoration, and painting work on the metal structure of a bridge over a river.

Accesus has been responsible for the design, manufacturing, customer training, and assembly of the KOMPLET Suspended Scaffold with 2 Bridge Suspension Outriggers, specially downsized for this bridge.

  • Ubicación: Portugal
  • Sector: Eólico
  • Subsector: Mantenimiento palas aerogenerador
  • Aplicación: Palas

Project requirements

The client needs to carry out repair, restoration, and painting work on the metal structure of a bridge over a river.

Accesus has been responsible for the design, manufacturing, customer training, and assembly of the KOMPLET Suspended Scaffold with 2 Bridge Suspension Outriggers, specially reduced for this bridge.

  • Location: Catalonia, Spain
  • Sector: Civil engineering
  • Subsector: Bridge maintenance
  • Application: Bridges and viaducts

Solution

The assembly was complex due to the limited space available to place the counterweights for the suspension outriggers.

Ultimately, the work was successfully completed according to the plan, and the client was fully satisfied.

  • Project Ref: 200036
  • Bridge height: 40 meters.
  • Regulations: 2006/42/EC, EN 1808.

Solution

The assembly was complex due to the limited space available to place the counterweights for the suspension outriggers.

Ultimately, the work was successfully completed according to the plan, and the client was fully satisfied.

  • Project Ref: 200036
  • Bridge height: 40 meters.
  • Regulations: 2006/42/EC, EN 1808.

Project photos

These are some of the photographs we took at the exact moment during the installation and commissioning of the project.

In them, you will be able to appreciate the materials used, the work of our team during assembly, and the quality of the entire deployment.

Project photos

These are some of the photographs we took at the exact moment during the installation and commissioning of the project.

In them, you will be able to appreciate the materials used, the work of our team during assembly, and the quality of the entire deployment.