Suspended rotating platform on rail for blast furnace maintenance in steelworks

Project requirements

The client requires a means to perform repairs inside a blast furnace. It is an essential condition that all equipment be assembled from above, through the upper furnace inlet located on one side.

Development, supply, assembly, testing, customer training, and personnel stand-by services throughout the industrial shutdown of a blast furnace using a special rotating and extensible hanging platform.

  • Location: Asturias, Spain
  • Sector: Industry
  • Subsector: Steel mill
  • Application: Blast Furnace

Project requirements

The client requires a means to perform repairs inside a blast furnace. It is an essential condition that all equipment be assembled from above, through the upper furnace inlet located on one side.

Development, supply, assembly, testing, customer training, and personnel stand-by services throughout the industrial shutdown of a blast furnace using a special rotating and extensible hanging platform.

  • Location: Asturias, Spain
  • Sector: Industry
  • Subsector: Steel mill
  • Application: Blast Furnace

Solution

We developed a fully custom equipment set, from the platform with a special T-shaped balcony and a telescopic system to the folding suspension rail, to allow entry through the side upper opening.

The complete equipment was deployed and assembled at a height of 30 meters. Working conditions inside a Blast Furnace are extremely harsh; our equipment and personnel rose to the occasion, and the client achieved improvements in their work times.

  • Project ref: 211006
  • Maximum height: 30 meters
  • Rotation: 360º
  • Regulations: 2006/42/EC, EN 1808

Solution

We developed a fully custom equipment set, from the platform with a special T-shaped balcony and a telescopic system to the folding suspension rail, to allow entry through the side upper opening.

The complete equipment was deployed and assembled at a height of 30 meters. Working conditions inside a Blast Furnace are extremely harsh; our equipment and personnel rose to the occasion, and the client achieved improvements in their work times.

  • Project ref: 211006
  • Maximum height: 30 meters
  • Rotation: 360º
  • Regulations: 2006/42/EC, EN 1808

Project photos

These are some of the photographs we took at the exact moment during the installation and commissioning of the project.

In them, you will be able to appreciate the materials used, our team's work during assembly, and the quality of the entire deployment.

Project photos

These are some of the photographs we took at the exact moment during the installation and commissioning of the project.

In them, you will be able to appreciate the materials used, our team's work during assembly, and the quality of the entire deployment.