BASIC suspended cabin for work on port docks

Project requirements

The client requires equipment for concrete maintenance operations on a harbor pier.

Rental supply of 1 manual Accesus Basic suspended cabin for 2 people, suspended from a Brakoo davit arm elevated to 2.5 meters.

  • Location: Barcelona, Spain
  • Sector: Civil engineering
  • Subsector: Port maintenance
  • Application: Harbors and Ports

Project requirements

The client requires equipment for concrete maintenance operations on a harbor pier.

Rental supply of 1 manual Accesus Basic suspended cabin for 2 people, suspended from a Brakoo davit arm elevated to 2.5 meters.

  • Location: Barcelona, Spain
  • Sector: Civil engineering
  • Subsector: Port maintenance
  • Application: Harbors and Ports

Solution

A manual suspended cradle to avoid electrical issues when in contact with seawater, suspended from a Brakoo davit arm at its maximum height.

Access to the work zone is made very simple with this 100% standard combination of cabin and davit arm.

  • Project Ref: 200001
  • Height: 5 meters
  • Regulations: 2006/42/EC, EN 1808

Solution

A manual suspended cradle to avoid electrical issues when in contact with seawater, suspended from a Brakoo davit arm at its maximum height.

Access to the work zone is made very simple with this 100% standard combination of cabin and davit arm.

  • Project Ref: 200001
  • Height: 5 meters
  • Regulations: 2006/42/EC, EN 1808

Project photos

These are some of the photographs we took at the exact moment during the installation and commissioning of the project.

In them, you will be able to appreciate the materials used, our team's work during assembly, and the quality of the entire deployment.

Project photos

These are some of the photographs we took at the exact moment during the installation and commissioning of the project.

In them, you will be able to appreciate the materials used, our team's work during assembly, and the quality of the entire deployment.