The client needs to access the stay cables of the Fernandez Casado cable-stayed bridge, which consists of two 120-meter-high pylons and 220 stay cables that support the bridge deck.
Development of a suspended platform capable of accessing the different stay cables of the two bridge pylons along their entire length. A top traction trolley and two suspended cradles—one on each side of the cable—will be used.