The double-deck platforms allow operators to properly handle the 4-meter-high panels.
The suspension is initially anchored to the concrete at the 130-meter level. Once all floors have been poured, the same platforms are suspended from parapet clamps located at the top of the building. Using this system, the suspended platforms could be used before topping out the building, increasing the assembly rate of the facade.