Modublade platform for maintenance of GAMESA G-47 wind turbine blades

Project requirements

Provide a solution for the maintenance of the blades of a Gamesa G47 model wind turbine with a height of 45 meters.

Implementation of Modublade blade platforms, including suspension on the wind turbine and customer training for the assembly and use of the suspended platform.

  • Location: Catalonia, Spain
  • Sector: Wind Power
  • Subsector: Wind turbine blade maintenance
  • Application: Blades

Project requirements

Provide a solution for the maintenance of the blades of a Gamesa G47 model wind turbine with a height of 45 meters.

Implementation of Modublade blade platforms, including suspension on the wind turbine and customer training for the assembly and use of the suspended platform.

  • Location: Catalonia, Spain
  • Sector: Wind Power
  • Subsector: Wind turbine blade maintenance
  • Application: Blades

Solution

Modublade wind turbine blade maintenance platform for 2 people with a suspension system suitable for Gamesa G47. Customer training.

  • Project Ref: 200009
  • Mast height: 45.5 meters
  • Regulations: 2006/42/EC, EN 1808

Solution

Modublade wind turbine blade maintenance platform for 2 people with a suspension system suitable for Gamesa G47. Customer training.

  • Project Ref: 200009
  • Mast height: 45.5 meters
  • Regulations: 2006/42/EC, EN 1808

Project photos

These are some of the photographs we took at the exact moment during the installation and commissioning of the project.

In them, you will be able to appreciate the materials used, our team's work during assembly, and the quality of the entire deployment.

Project photos

These are some of the photographs we took at the exact moment during the installation and commissioning of the project.

In them, you will be able to appreciate the materials used, our team's work during assembly, and the quality of the entire deployment.