Modublade platform for maintenance of GAMESA G-10 wind turbine blades - FINLAND

Project requirements

Provide a solution for the maintenance of the blades of a G10 model wind turbine with a height of 140 meters.

Implementation of Modublade blade platforms, including suspension on the wind turbine and customer training for the assembly and use of the suspended platform in Finland.

  • Location: Finland
  • Sector: Wind Power
  • Subsector: Wind turbine blade maintenance
  • Application: Blades

Project requirements

Provide a solution for the maintenance of the blades of a G10 model wind turbine with a height of 140 meters.

Implementation of Modublade blade platforms, including suspension on the wind turbine and customer training for the assembly and use of the suspended platform in Finland.

  • Location: Finland
  • Sector: Wind Power
  • Subsector: Wind turbine blade maintenance
  • Application: Blades

Solution

Modublade wind turbine blade maintenance platform for 2 people with a suspension system suitable for GAMESA G10. Customer training.

  • Project Ref: 200009
  • Mast height: 140 meters
  • Regulations: 2006/42/EC, EN 1808

Solution

Modublade wind turbine blade maintenance platform for 2 people with a suspension system suitable for GAMESA G10. Customer training.

  • Project Ref: 200009
  • Mast height: 140 meters
  • Regulations: 2006/42/EC, EN 1808

Project photos

These are some of the photographs we took at the exact moment during the installation and commissioning of the project.

In them, you will be able to appreciate the materials used, our team's work during assembly, and the quality of the entire deployment.

Project photos

These are some of the photographs we took at the exact moment during the installation and commissioning of the project.

In them, you will be able to appreciate the materials used, our team's work during assembly, and the quality of the entire deployment.