Project requirements

Provide a solution for wind turbine blade maintenance equipped with 2 wire rope hoists.

Modification of the Modublade platform to integrate a second hoist and fall arrest system, utilizing the same parts as the standard model.

  • Location: Spain
  • Sector: Wind Power
  • Subsector: Wind turbine blade maintenance
  • Application: Blades

Project requirements

Provide a solution for wind turbine blade maintenance equipped with 2 wire rope hoists.

Modification of the Modublade platform to integrate a second hoist and fall arrest system, utilizing the same parts as the standard model.

  • Location: Spain
  • Sector: Wind Power
  • Subsector: Wind turbine blade maintenance
  • Application: Blades

Solution

Modification of certain basket components, such as the railing and floor, to allow for the installation of a second wire rope hoist.

  • Ref proyecto: 200009 
  • Altura del fuste: 120 metros 
  • Normativas: 2006/42/CE, EN 1808 

Solution

Modification of certain basket components, such as the railing and floor, to allow for the installation of a second wire rope hoist.

  • Ref proyecto: 200009 
  • Altura del fuste: 120 metros 
  • Normativas: 2006/42/CE, EN 1808 

Project photos

These are some of the photographs we took at the exact moment during the installation and commissioning of the project.

In them, you will be able to appreciate the materials used, our team's work during assembly, and the quality of the entire deployment.

Project photos

These are some of the photographs we took at the exact moment during the installation and commissioning of the project.

In them, you will be able to appreciate the materials used, our team's work during assembly, and the quality of the entire deployment.