Suspended platform for WWTP well maintenance

icono proyectos mas detalles
Project overview
separador magenta

  • null

    Location

    Bilbao, Spain

  • obra civil

    Sector

    Civil works

  • null

    Subsector

    Hydraulic works

  • null

    Application

    Wastewater Treatment Plants

  • null

    Technical information

    Project Ref.: 200006 

    Max. Height: 30 meters

    Adjustable for different lengths: Yes

    Regulations: 2006/42/CE, EN 1808  

uno
Background
separador magenta

The customer needs to renovate several wells in a WWTP.

dos
Project
separador magenta

Development, provision, assembly, testing, and customer training on an electric suspension platform that allows people’s placement and work inside of different sized wells.

tres
Solution
separador magenta

Suspended platform with a raised spreader beam.

The platform allows quick access to the different wells’ interior and can be configured in lengths from 2 to 8 meters.

The platform is composed of standard parts from the KOMPLET range.

icono proyectos descargar
Technical documentation
separador magenta

Related products
separador magenta

Contact us
separador magenta

Ajustes de privacidad
Cuando visita nuestro sitio web, éste puede almacenar información a través de su navegador de servicios específicos, normalmente en forma de cookies. Aquí puede cambiar sus preferencias de privacidad. Tenga en cuenta que el bloqueo de algunos tipos de cookies puede afectar a su experiencia en nuestro sitio web y a los servicios que ofrecemos.