Suspended platform for bridge maintenance

icono proyectos mas detalles
Project overview
separador magenta

  • null

    Location

    Guadalajara, Mexico

  • obra civil

    Sector

    Civil works

  • null

    Subsector

    Bridge maintenance

  • null

    Application

    Bridges and viaducts

  • null

    Technical information

    Project Ref.: 211009 

    Height: 100 meters 

    Regulations: 2006/42/CE, EN 1808  

uno
Background
separador magenta

In order to carry out a total renovation in a bridge made of riveted steel, the customer requests a means that allows access to the lower face of the bridge’s metal deck. It needs to have vertical and horizontal movement to cover the entire bridge.

dos
Project
separador magenta

Provision of an Accesus Komplet suspended platform that runs on rails to access any part of the bridge from the lower side.

Development of a second, wider platform to carry out the maintenance work.

tres
Solution
separador magenta

The first, smaller platform runs along the rail to transport the workers to the main working platform.

The working platform with a special width of 1.5 meters is suspended by motorized trolleys perpendicular to the bridge.

The total height is almost 500 meters above the ground at the central river spot. It was decided to power the platform with an autonomous generator to avoid long electric hoses.

icono proyectos descargar
Technical documentation
separador magenta

Related products
separador magenta

Contact us
separador magenta

Ajustes de privacidad
Cuando visita nuestro sitio web, éste puede almacenar información a través de su navegador de servicios específicos, normalmente en forma de cookies. Aquí puede cambiar sus preferencias de privacidad. Tenga en cuenta que el bloqueo de algunos tipos de cookies puede afectar a su experiencia en nuestro sitio web y a los servicios que ofrecemos.